Skip to main content

Engineering Calculators

🛠️ Improvements & Fixes

  • Concrete Beam (ACI 318-19) 🇺🇸: Added support for varying stirrup spacing with separate support and mid-span zones based on support locations, replacing the single-value stirrup approach for more accurate shear reinforcement design.
  • Combined Footing (IBC 2024) 🇺🇸: Added separate bar size inputs for top and bottom reinforcement in both X and Y axes, replacing the shared bar size input for more precise development length calculations.

Atlas Tube Connection Hub

🛠️ Improvements & Fixes


Platform Improvements

🛠️ Improvements & Fixes

  • Combine Mode Analytics: Added comprehensive instrumentation across Editor, Review, and Combine workflows to track navigation funnels, widget actions, and edit patterns, giving the team better visibility into how Combine Mode is used.