What it calculates
Determine Bushfire Attack Level (BAL) for building sites to AS 3959:2018. Supports both simplified and detailed calculation methods using fire danger index, vegetation classification, distance, and effective slope.
Who uses this calculator
Australian structural engineers and building practitioners determining Bushfire Attack Level for site classification and construction requirements under AS 3959:2018. Supports both the simplified lookup method and the detailed Appendix B method using fire danger index, vegetation type, effective distance, and slope.
How it calculates
The Bushfire Attack Level calculator determines BAL for a site per AS 3959:2018.
Simplified method (AS 3959:2018, Tables 2.4.2 and 2.4.3)
The simplified method looks up BAL from AS 3959:2018 Table 2.4.2 (for sites in FDI 80 fire weather regions) or Table 2.4.3 (for sites in FDI 100 fire weather regions). Inputs are:
- FDI - Fire Danger Index for the region (80 or 100), derived from AS 3959:2018 Figure 1.5 or the relevant state government authority
- Vegetation class - Grassland, Scrub, Shrubland, Mallee/mulga/heath, Rainforest, or Forest
- Distance - horizontal distance in metres between the site and the nearest edge of classified vegetation
- Effective slope - slope under the vegetation in degrees (upslope increases fire intensity; downslope decreases it)
The table returns one of six BAL ratings: LOW, 12.5, 19, 29, 40, or FZ (Flame Zone), increasing in severity with higher heat flux.
Detailed method (AS 3959:2018, Appendix B)
The detailed method calculates the radiant heat flux (kW/m²) at the site directly from fuel and weather parameters using the McArthur fire spread model:
- Fuel age and fuel moisture content - derived from climate data or entered directly
- Wind speed at 10 m height - from the design fire weather scenario
- Ambient temperature and relative humidity - from the design weather event
- Fuel heat of combustion - for the vegetation type
The calculated flame height and heat flux are compared to the BAL threshold values in AS 3959:2018 Table 2.4.4 to determine the governing BAL. The detailed method can produce a less conservative result than the simplified method for sites where table inputs do not closely match actual conditions.
BAL thresholds and construction requirements
| BAL | Radiant heat flux | Construction section | |-----|-------------------|----------------------| | LOW | less than 12.5 kW/m² | No specific requirements | | BAL-12.5 | 12.5 kW/m² | Section 3 | | BAL-19 | 19 kW/m² | Section 4 | | BAL-29 | 29 kW/m² | Section 5 | | BAL-40 | 40 kW/m² | Section 6 | | BAL-FZ | greater than 40 kW/m² | Section 7 (Flame Zone) |
The calculator reports the governing BAL and the applicable AS 3959:2018 section, so construction specifications can be drawn directly from the result.